THE SCHOOL FAILED TO REINSPECT THE BUILDING FOR ASBESTOS EVERY THREE YEARS, AS REQUIRED, AND HIRED UNACCREDITED COMPANIES AND WORKERS TO DESIGN AND PERFORM WORK THAT DISTURBED ASBESTOS MATERIAL AT THE SCHOOL. AT THE CONCLUSION OF THE JOB, NO VISUAL INSPECTION WAS DONE, AND AIR SAMPLES WERE NOT TAKE CORRECTLY.