# B&S PIKE ASSOCIATES, L.P.
> **Administrative - Formal** · FY2001 · — · Final Order With Penalty
## Case
- **Activity ID:** `19429`
- **Case Number:** 03-2001-0047
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $130K
- **Cost recovery:** —
- **Compliance action $:** $75K
- **Multimedia (multi-env):** N
## Defendants
- B&S PIKE ASSOCIATES, L.P. (complaint) (settlement)
- FULL MOON CONSTRUCTION CO., INC. (complaint) (settlement)
- TERRA ENVIRONMENTAL CONTRACTORS, INC. (complaint) (settlement)
- TORYPETE MANAGEMENT, INC. (complaint) (settlement)
## Summary

B&S IS THE OWNER OF THE FACILITY AND HIRED TORYPETE AS       GENERAL CONTRACTOR RESPONSIBLE FOR SITE DEVELOPMENT WITH     RESPECT TO THE DEMOLITION OF THE FORMER DOWNINGTOWN FARMER'S MARKET AND ADJACENT FORMER RESIDENTIAL STRUCTURES, THE       CONSTRUCTION OF THE NEW ASHBRIDGE SQUARE AT EAST CALN        SHOPPING CENTER AND THE MANAGEMENT OF THE SUBCONTRACTORS     IT ENGAGED TO PERFORM DEMOLITION, ASBESTOS REMOVAL,          REDEVELOPMENT AND OTHER SITE-RELATED ACTIVITIES.  FULL MOON  CONSTRUCTION CO., INC. WAS THE PRIME SUBCONTRACTOR HIRED BY  TORYPETE MANAGEMENT, INC. TO DEMOLISH ALL STRUCTURES AT THE  FACILITY, PERFORM ANY NECESSARY ASBESTOS ABATEMENT AND       OTHERWISE PREPARE THE SITE FOR REDEVELOPMENT.  TERRA         ENVIRONMENTAL CONTRACTORS, INC. WAS A SUBCONTRACTOR OF FULL  MOON CONSTRUCTION CO., INC. AND WAS HIRED TO ASSIST FULL     MOON IN PERFORMING DEMOLITION ACTIVITIES, INCLUDING CERTAIN  ASBESTOS ABATEMENT ACTIVITIES, AT THE FACILITY.              THROUGH A FACILITY INSPECTION AND INFORMATION REQUEST LETTER EPA ALLEGES THAT ALL OF THE RESPONDENTS VIOLATED THE CAA AND APPLICABLE ASBESTOS NESHAP REQUIREMENTS BY FAILING TO:       THOROUGHLY INSPECT THE FACILITY FOR THE PRESENCE OF ASBESTOS PRIOR TO THE COMMENCEMENT OF DEMOLITION OPERATIONS IN ORDER  TO DETERMINE THE APPLICABLE ASBESTOS NESHAP REQUIREMENTS;    PROVIDE WRITTEN NOTICE TO EPA REGARDING DEMOLITION           ACTIVITIES AT THE FACILITY AT LEAST TEN (10) DAYS PRIOR TO   INITIATING ASBESTOS STRIPPING, REMOV

---