# Caguas Real Home Resort, CRU Corp.
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `200004126`
- **Case Number:** 02-2006-3323
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Caguas Real Home Resort, Cru Corp. (complaint) (settlement)
## Summary

CRU started construction on a new housing construction site located at State Road PR-52, Exit #22/23 in Caguas, Puerto Rico, disturbing 381.25 acres of land.  While an NOI obtaining coverage under EPA's Construction General Permit was submitted on April 7, 2004, and coverage started on April 14, 2004, the operator did not have a copy of the site's Storm Water  Pollution Prevention Plan on-site as required by the General Permit.  Penalty has been calcuated at $4,000 for not having the SWPPP available on-site.  The facility had storm water sedimentation basins installed and in use.  Construction at the site is now complete.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*