7/26/06 - ADMINISTRATIVE ORDER ISSUED. RESPONDENT FAILED TO LIST AND DESCRIBE CONTROLS APPROPRIATE FOR THE CONSTRUCTION ACTIVITIES AS AS THE PROCEDURES FOR IMPLEMENTING SUCH CONTROLS IN THE SWPPP. RESPONDENT FAILED TO ADDRESS MINIMUM COMPONENTS IN THE SWPPP SUCH AS IMPLEMENTING APPROPRIATE TEMPORARY OR PERMANENT VEGETATIVE PRACTICES WITHIN SEVEN (7) CALENDAR DAYS; BEFORE MAJOR SITE GRADING, INSTALLATION OF A TEMPORARY (OR PERMANENT) SEDIMENT BASIN PROVIDING AT LEAST 3600 CUBIC FEET (133 CUBIC YARDS) OF STORAGE PER ACRE WITHIN DRAINAGE LOCATIONS THAT SERVE AN AREA WITH TEN OR MORE DISTURBED AREAS, UTIL FINAL STABILIZATION OF THE SITE; AND A DESCRIPTION OF ANY POST-CONSTRUCTION CONTROL MEASURES THAT SHALL BE INSTALLED TO CONTROL POLLUTANTS POLLUTANTS IN STORM WATER AFTER CONSTRUCTION IS COMPLETE. RESPONDENT FAILED TO IDENTIFY ALL ALLOWABLE SOUCRES OF NON-STORMWATER DISCHARGES, AND FAILED TO ODENTIFY AND ENSURE THE IMPLEMENTATION OF APPROPRIATE BMPS IN THE SWPPP. COMPLY WITH PERMIT. IN VIOLATION OF CWA SECTIONS 301 AND 402.