# PROVIDENCE METALLIZING COMPANY INC
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `200004665`
- **Case Number:** 01-2006-1202
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- PROVIDENCE METALIZING COMPANY INC (SB) (complaint) (settlement)
## Summary

AS A RESULT OF AN EPA INSPECTION IN OCTOBER 2004 AND NOVEMBER 2004, EPA ALLEGES THAT PMC HAS VIOLATED 40 C.F.R. PART 63 SUBPARTS N AND T BY FAILING TO EMPLOY ONE OF THE SPECIFIED CONTROL COMBINATIONS FOR A DEGREASER; HAVE AN O and M PLAN FOR A DEGREASER; SUBMIT ANNUAL REPORTS AND SEMI ANNUAL EXCEEDANCE REPORTS FOR BOTH DEGREASERS. HAVE O and M PLAN FOR A CHROMIUM TANK, AND SUBMIT ONGOING COMPLIANCE STATUS REPORTS FOR A CHROMIUM TANK. EPA ALSO ALLEGES THAT PMC FAILED TO OPERATE ITS THERMAL OXIDIZER AT OR ABOVE THE MINIMUM REQUIRED TEMPERATURE ON FIVE DAYS IN 2003.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*