# GENERAL LAMINATES, INC.
> **Judicial** · FY1989 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `20467`
- **Case Number:** 04-1989-0071
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $244K
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BASIL J. FALCONE (complaint) (settlement)
- GENERAL LAMINATES, INC. (complaint) (settlement)
- J. BRYAN DOWLING (complaint) (settlement)
## Summary

THIS REFERRAL REQUESTS THAT A CIVIL ACTION BE FILED       PURSUANT TO SECTION 107 OF THE COMPREHENSIVE ENVIRONMENTAL   RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) OF 1980,  42 U.S.C. SECTION 9607, AS AMENDED BY THE SUPERFUND AMEND-   MENTS AND REAUTHORIZATION ACT (SARA) OF 1986, P.L. 99-499,   FOR REIMBURSEMENT OF COSTS INCURRED BY THE UNITED STATES     ENVIRONMENTAL PROTECTION AGENCY (EPA) IN RESPONSE TO THE     RELEASE AND THREATHENED RELEASE OF HAZARDOUS SUBSTANCES AT   THE GENERAL LAMINATES SITE (SITE) IN JASPER, HAMILTON        COUNTY, FLORIDA.  THE POTENTIAL DEFENDANTS INCLUDE THE       PERSONS, AS THE TERM IS DEFINED IN SECTION 101(21) OF        CERCLA, WHO: (1) OWNED OR OPERATED THE SITE; (2) PRESENTLY   OWN THE SITE; (3) GENERATED OR TRANSPORTED HAZARODUS SUB-    STANCES TO THE SITE OR ARRANGED WITH A TRANSPORTER FOR THE   TRANSPORT FOR DISPOSAL OF HAZARDOUS SUBSTANCES AT THE SITE;  AND (4) ACCEPTED HAZARDOUS SUBSTANCES AND TRANSPORTED THEM   TO THE SITE. THIS WAS AN EMERGENCY REMOVAL ACTION TAKEN      UNDER SECTION 106 OF CERCLA.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*