# FLOWOOD SITE - THE MARMON CORPORATION
> **Judicial** · FY1990 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `20587`
- **Case Number:** 04-1990-0071
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $350K
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CONTINENTAL CAN CO. (complaint) (settlement)
- MARMON CORPORATION (complaint) (settlement)
- RIVAL MANUFACTURING CO. (complaint) (settlement)
- UNITED GAS PIPE LINE CO. (complaint) (settlement)
## Summary

A CONSENT  DECREE WAS DIRECTLY ENTERED INTO THAT REQUIRES THE DEFENDANTS TO COMPLY WITH THE INJUNCTIVE ACTION SOUGHT TO ADDRESS THE TREAT ARISING FROM THE RELEASE OF HAZARDOUS SUBSTANCES AT THE CITY OF FLOWOOD, MISSISSIPPI.  IN  ADDITION, THE DECREE REQUIRES DEFENDANTS TO REIMBURSE THE U.S. IN PAST RESPONSE COSTS AND TO REIMBURSE THE U.S. FOR    ALL FUTURE OVERSIGHT COSTS.  THE DECREE ALSO REQUIRES  DEFENDANTS TO IMPLEMENT, AT THEIR OWN COSTS, THE FULL  REMEDY SET FORTH IN THE ROD.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*