# ARAB PLATING SITE
> **Judicial** · FY1991 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `20712`
- **Case Number:** 04-1991-0036
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $12K
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BOWLING INDUSTRIES, INC. (complaint) (settlement)
- BOWLING, DAVID (complaint) (settlement)
- BOWLING, REGINA (complaint) (settlement)
## Summary

THE SITE WAS OPERATED BY DAVID BOWLING AS BOWLING        INDUSTRIES, INC., AN ELECTROPLATING COMPANY LOCATED ON       BRASHIER'S CHAPEL ROAD IN A RURAL AREA OF MARSHALL COUNTY,   ALABAMA NEAR THE TOWN OF ARAB. LARGE QUANTITIES OF HAZAR-    DOUS WASTE GENERATED DURING ELECTROPLATING OPERATIONS HAVE   BEEN ABANDONED AT THIS BANKRUPT FACILITY. WASTE PROCESS      MATERIAL WAS STORED IN SUCH A MANNER THAT A RELEASE OF       HAZARDOUS SUBSTANCES TO THE ENVIRONMENT HAD OCCURRED WHEN    EPA REGION IV WAS NOTIFIED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*