# YELLOW WATER ROAD (OU1 & OU2) - CD
> **Judicial** · FY1991 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `20731`
- **Case Number:** 04-1991-0058
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** $1.47M
- **Compliance action $:** $4.04M
- **Multimedia (multi-env):** N
## Defendants
- AMERICAN NATIONAL CAN COMPANY (complaint) (settlement)
- ARIZONA, STATE OF (complaint) (settlement)
- COMMONWEALTH ALUMINUM CORPORATION (complaint) (settlement)
- CONNECTICUT, STATE OF (DEPT OF TRANSPOR) (complaint) (settlement)
- CONSOLIDATED MINERALS, INC. (complaint) (settlement)
- E.I. DUPONT DE NUMOURS & CO., INC. (complaint) (settlement)
- MARTIN MARIETTA TECHNOLOGIES (complaint) (settlement)
- OWENS-ILLINOIS, INC. (complaint) (settlement)
- TAMPA ELECTRIC COMPANY (complaint) (settlement)
- UNION CAMP CORPORATION (complaint) (settlement)
- UNION OIL COMPANY OF CALIFORNIA (complaint) (settlement)
## Summary

THE SITE WAS USED IN THE EARLY 1980'S TO STORE               PCB-CONTAMINATED FLUIDS AND DEBRIS.  AS A RESULT OF          RECLAMATION ACTIVITIES AND SPILLAGE, SOIL AND GROUNDWATER    BECAME CONTAMINATED WITH PCB'S.  EACH DEFENDANT ARRANGED FOR THE DISPOSAL OF PCB'S AT THE SITE.                           THE SOIL ROD REQUIRES EXCAVATION, TREATMENT AND ON-SITE      SOLIDIFICATION OF CONTAMINATED SOILS.  THE GROUNDWATER ROD   CALLS FOR MONITORING ONLY, BUT AS A CONTINGENCY REQUIRES A   CONVENTIONAL PUMP AND TREAT REMEDY SHOULD MONITORING         INDICATE THAT THE PLUME IS MOVING.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*