# JM PAINTING & CONSTRUCTION CO INC
> **Judicial** · FY1986 · — · Final Order With Penalty
## Case
- **Activity ID:** `2080`
- **Case Number:** 02-1986-0105
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $23K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- JM PAINTING & CONSTRUCTION CO INC (complaint) (settlement)
- NEWARK BOARD OF EDUCATION (complaint) (settlement)
## Summary

THIS PROPOSES A CIVIL ACTION AGAINST JM PAINTING & CON-    STRUCTION CO., INC. ( JM PAINTING ) AND THE NEWARK BOARD OF  EDUCATION ( THE BOARD ) FOR VIOLATION OF SECTION 112 OF THE  CAA.                                                          JM PAINTING IS ENGAGED IN ASBESTOS REMOVAL OPERATIONS IN    N.J. AND WAS THE OPERATOR OF THE ASBESTOS RENOVATION AT THE  VAILSBURG HIGH SCHOOL IN NEWARK, NJ AND, THEREFORE, WAS RE-  SPONSIBLE FOR COMPLIANCE WITH 40 CFR PART 61, SUBPART M.  AS THE OWNER OF VAILSBURG HIGH SCHOOL, THE BOARD ALSO WAS RE-   SPONSIBLE FOR COMPLIANCE WITH SUBPART M.                       DURING AN 8/27/85 INSPECTION, THE EPA INSPECTOR TOOK 6     SAMPLES.  THE LAB ANALYSES SHOW THAT 3 OF THE SAMPLES TAKEN  FROM THE VAILSBURG HIGH SCHOOL CONTAINED IN EXCESS OF 1%     ASBESTIFORM MINERAL CHRYSOTILE AND CONFIRMED THE INSPECTOR'S INITIAL IDENTIFICATION OF THE MATERIALS AS FRIABLE ASBESTOS.   AT THE TIME OF THE EPA INSPECTION, THE ASBESTOS REMOVAL    HAD BEEN  COMPLETED  BY JM PAINTING.  IN ACCORDANCE WITH THE EPA ASBESTOS STRATEGY, DATED 4/6/84,                         *                                                            MEMO TO FILE DATED MARCH 30, 1999 DECREE SATISFIED AND CASE  CLOSED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*