SITE CONSISTS OF 2 OPERATING FACILITIES LOCATED ACROSS THE STREET FROM ONE ANOTHER: THE 17.36 ACRE REEVES SOUTHEASTERN GALVANIZING (SEG) FACILITY ON THE NORTH SIDE OF STATE ROAD 574, & THE 11.6 ACRE REEVES SOUTHEASTERN WIRE (SEW) FACILITY LOCATED ON THE SOUTH SIDE OF STATE ROAD 574. THE SEW FACILITY IS LOCATED TO THE EAST OF & DIRECTLY ADJACENT TO THE PEAK OIL SUPERFUND SITE, WHICH IN TURN IS LOCATED TO THE EAST OF & DIRECTLY ADJACENT TO THE BAY DRUMS SUPERFUND SITE. SEG FACILITY LISTED ON NPL; SEW FACILITY WAS NOT; HOWEVER, IT IS CONSIDERED TO BE PART OF SITE SINCE CONTAMINATION WAS FOUND THERE & IS BEING ADDRESSED IN EPAs OU1 ROD. THE SEG FACILITY PRE-TREATS & GALVANIZES COMMERCIAL STEEL PRODUCTS. A 300-GAL TANK SITUATED IN A SMALL RECTANGULAR AREA IN THE NW CORNER OF THE MAINTENANCE SHED WAS USED IN THE 1960'S AS A WASTEWATER CATCH BASIN DURING ELECTROPLATING OPERATIONS. SEG UTILIZED 2 DEPRESSIONS AS PERCOLATION/EVAPORATION PONDS FOR DISPOSAL OF PROCESS WASTEWATER GENERATED BY PLANT. PONDS LATER ENLARGED TO THEIR PRESENT SIZE OF 100' BU 100' EACH, WITH 5' BERMS SURROUNDING THEM & BELOW GRADE DEPTH OF ABOUT 10'. PONDS USED TIL 1982, WHEN CURRENT WASTEWATER PRETREATMENT SYSTEM WAS INSTALLED. SEG'S WASTEWATER IS NOW DISCHARGED INTO THE LOCAL POTW. AT SEW FACILITY, STEEL WIRE IS DRAWN, WEAVED INTO CHAIN LINK FENCE, PRE-TREATED & GALVANIZED. FACILITY UTILIZED 3 PERCOLATION/EVAPORATION PONDS FOR DISPOSAL OF WASTEWATER. 1st POND (APPROX 75' BY 25') CONSTRUCTED IN 1955