# OLIN / MCINTOSH  OU1
> **Judicial** · FY1994 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `21055`
- **Case Number:** 04-1994-0265
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** $889K
- **Compliance action $:** $9.96M
- **Multimedia (multi-env):** N
## Defendants
- OLIN CORPORATION (complaint) (settlement)
## Summary

REGION IV ENTERED INTO A CERCLA SECTION 106/107, 42 U.S.C.   SECTION 9606/9607, CONSENT DECREE WITH OLIN CORPORATION      (OLIN) FOR THE PERFORMANCE AND FUNDING OF A COMPLETE         REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) FOR OPERABLE UNIT 1  AT THE OLIN CHEMICAL/MCINTOSH PLANT SITE, MCINTOSH,          WASHINGTON COUNTY ALABAMA (THE SITE) AND FOR REIMBURSEMENT   OF 100% OF PAST COSTS INCURRED AT THE SITE.                  THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) AT THE SITE HAS  BEEN DIVIDED INTO TWO OPERABLE UNITS.  OU1 CONSISTS OF THE   ACTIVE PRODUCTION FACILITY; AND OU2 INCLUDES THE BASIN AND   THE WASTEWATER DISCH LEADING TO THE BASIN.  A ROD FOR OU1    WAS SIGNED ON DECEMBER 16, 1994.  EPA SEND OLIN A SPECIAL    NOTICE LETTER ON 1/11/95 AND A GOOD FAITH OFFER WAS RECEIVED ON 2/17/95.  OLIN SIGNED THE CD FOR OU1 ON 6/8/95.  REGION   IV SIGNED THE CD FOR OU1 ON 6/16/95 AND DOJ SIGNED ON        7/3/95.                                                      2.  OLIN CORP., AS THE OWNER AND OPERATOR OF THE FACILITY,   AS WELL AS THE GENERATOR OF THE HAZARDOUS SUBSTANCES         RELEASED INTO THE ENVIRONMENTAL AT THE SITE, IS THE ONLY     CERCLA SECTION 107(A) LIABLE PARTY.                          3.  UNDER THE TERMS OF SETTLEMENT EMBODIED IN THE CD, OLIN   WILL PERFORM AND FUND THE ENTIRE OU1 RD/RA, AND REIMBURSE    THE U.S. FOR COSTS INCURRED BY THE U.S. UNDER THE TERMS OF   THE CD, INCLUDING, BUT NOT LIMITED TO OVERSIGHT COSTS.  THE  ESTIMATED COST OF IMPLEMENTING THE S

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*