# CIBA-GEIGY (OU3)
> **Judicial** · FY1995 · — · Final Order No Penalty
## Case
- **Activity ID:** `21383`
- **Case Number:** 04-1995-0332
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** $0
- **Cost recovery:** $0
- **Compliance action $:** $1.50M
- **Multimedia (multi-env):** N
## Defendants
- CIBA-GEIGY CORPORATION, INC. (complaint) (settlement)
## Summary

BACKGROUND:  THE CIBA-GEIGY SUPERFUND SITE (THE SITE) CONSISTS OF FOUR OPERABLE UNITS.  CIBA-GEIGY CORPORATION, INC. IS THE ONLY PRP AT THE CIBA-GEIGY SITE, LOCATED IN MCINTOSH, ALABAMA.  CIBA-GEIGY HAS ALREADY SIGNED CONSENT DECREES FOR OPERABLE UNITS TWO AND FOUR, FOR CLEANUP OF SOILS AT ELEVEN FORMER WASTE MANAGEMENT UNITS.  OPERABLE  UNIT ONE, CONCERNING GROUNDWATER, IS BEING ADDRESSED UNDER   RCRA CORRECTIVE ACTION. OPERABLE UNIT THREE ADDRESSES  CONTAMINATION OF THE FLOODPLAIN AND A SWAMP AT THE SITE.  THE PROPOSED PLAN FOR OPERABLE UNIT THREE WAS ISSUED IN      DECEMBER, 1994.   5/96 - RD/RA CD THAT WAS REFERRED CONTAINS A FULL COVENANT  NOT TO SUE PROVISION, CONSISTENT WITH THE NEW MODEL RD/RA  CD.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*