← EPA enforcement cases

PULVAIR PESTICIDES SITE

Judicial · FY1995 · — · Final Order With Specified Cost Recovery · 21456

Penalty
$2.89M
Cost recovery
$2.40M
Compliance action

Case

Case Number
04-1995-0451
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
Multimedia
N
Self-disclosure
N

Defendants (23)

Summary

THIS IS AN ADMNISRATIVE MATTER. THE PULVAIRE CORPORATION OPERATED A AGRICULTURAL/CHEMICAL MANUFACTURING FACILITY. PULVAIRE OPERATED AS A CUSTOM BLENDER OF PESTICIDES AND VARIOUS AGRICULTURAL AND INDUSTRIAL CHEMICALS. HAZARDOUS SUBSTANCES INCLUDING HEAVY METALS AND PESTICIDES WERE DETECTED IN THE SOIL, GROUNDWATER, SURFACE WATER AND SEDIMENTS. IN 1990 EPA DETERMINED THAT A THREAT EXISTED DUE TO THE POOR STORAGE CONDITION WITHIN THE WAREHOUSES, MANUFACTURING AREAS AND OTHER AREAS ABOUT THE SITE. AN AOC WAS ISSUED TO R. ODABASHIAN ON 03/12/91. EPA CONDUCTED A FUND LEAD SOURCE REMOVAL IN JULY 1991.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown