# NORTH AMERICAN PHILIPS CORPORATION
> **Judicial** · FY1990 · — · Final Order With Penalty
## Case
- **Activity ID:** `220`
- **Case Number:** 01-1990-0053
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $500K
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- NORTH AMERICAN PHILIPS CORPORATION (complaint) (settlement)
## Summary

PHILIPS ELMET, A BRANCH OFFICE OF NORTH AMERICAN PHILIPS     CORPORATION, HAS FAILED TO INSTALL PRETREATMENT SUFFICIENT   FOR THE FACILITY TO MEET THE PSES FOR THE PRIMARY TUNGSTEN   SUBCATEGORY OF THE NON-FERROUS METALS MANUFACTURING POINT    SOURCE CATEGORY AND THE REFRACTORY METALS FORMING            SUBCATEGORY OF THE NON-FERROUS METALS FORMING AND METAL      POWDERS POINT SOURCE.                                        THE COMPANY WAS LATE COMPLYING WITH 40 CFR S403.12 REPORTING REQUIREMENTS FOR ITS REFRACTORY METALS FORMING PROCESSES AND HAS FAILED TO COMPLY WITH THE REPORTING REQUIREMENTS FOR ITS PRIMARY TUNGSTEN PROCESSES.                                  THE FACILITY HAS PERIODICALLY VIOLATED THE LOCAL EFFLUENT    STANDARDS AS WELL.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*