At Hampton Roads:
1. Respondent did not conduct an annual test of the automatic line leak detector in accordance with 9 VAC 25-580-170(1) for Tank 7 in calendar years 2005, 2006, 2007 and 2008 in violation of 9 VAC 25-580-140(2)(a)(1).
2. Respondent did not conduct an annual test of the automatic line leak detector conducted in accordance with of 9 VAC 25-580-170(1) for Tanks 8 and 9 in calendar years 2006, 2007, and 2008 in violation of 9 VAC 25-580-140(2)(a)(1).
3. Respondent did not conduct an annual line tightness test or perform monthly monitoring of the pressurized piping that conveys regulated substances associated with Tank 7 at the Hampton Facility during the time period October 26, 2005 Â April 26, 2007 and April 26, 2008 Â July 10, 2008 as required by 9 VAC 25-580-140(2)(a)(2).
4. Respondent did not conduct an annual line tightness test or perform monthly monitoring of the pressurized piping that conveys regulated substances associated with Tanks 8 and 9 at the Hampton Facility during the time periods September 28, 2006 Â April 26, 2007 and April 26, 2008 Â July 10, 2008 as required by 9 VAC 25-580-140(2)(a)(2) in violation of 9 VAC 25-580-140(2)(a)(2).
5. From January 1, 2005 through July 1, 2009, the galvanized steel piping that routinely contained regulated substances and was in contact with the ground that was associated with Tanks 1 Â 6 at the Hampton Facility did not have corrosion protection as required by 9 VAC 25-580-50(2)(b)(1) - (4