# JORGENSEN FORGE OUTFALL (LOWER DUWAMISH WATERWAY)
> **Administrative - Formal** · FY2011 · — · Final Order No Penalty
## Case
- **Activity ID:** `2200032349`
- **Case Number:** 10-2011-0017
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- BOEING COMPANY (settlement)
- JORGENSEN FORGE CORPORATION (settlement)
## Summary

TIME CRITICAL REMOVAL OF TWO LARGE OUTFALL PIPES THAT HAVE BEEN AND CONTINUE TO BE A SOURCE OF PCBS TO THE LOWER DUWAMISH WATERWAY.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*