# Acme Aerospace
> **Administrative - Formal** · FY2011 · — · Final Order With Penalty
## Case
- **Activity ID:** `2200044430`
- **Case Number:** 09-2011-5073
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Acme Aerospace (complaint) (settlement)
## Summary

Acme Aerospace designs and manufactures high-power bettery charges, power supplies, fibel nickel cadmium batteries, and back up systems.  Facility generates hazardous waste.  During a March 20, 2008 inspection, EPA found the following violations: failure to keep HW containers closed, failure to label HW containers, failure to maintain aisle space among containers of HW, failure to prepare a manifest for transport of HW, and failure to maintain the facility to prevent releases of HW.  Facility will pay a penalty of $31,300.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*