← EPA enforcement cases

OAK HILL PCB SUPERFUND SITE

Judicial · FY1997 · — · Final Order With Specified Cost Recovery · 22019

Penalty
$1.88M
Cost recovery
Compliance action

Case

Case Number
04-1997-0106
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
DOJ Docket
90-11-3-1738
Multimedia
N
Self-disclosure
N

Defendants (2)

Summary

THE SITE IS LOCATED IN LENOIR, CALDWELL COUNTY, NC, AND WAS FORMERLY OPERATED AS A SCRAP METAL BUSINESS DURING 1952 THROUGH THE EARLY 1970'S. THE OPERATION INVOLVED OPEN BURNING AND DISPOSAL OF PCB TRANSFORMERS AND CAPACITORS. THIS ACTIVITY RESULTED IN EXTENSIVE PCB CONTAMINATION OF THE SOILS AT THE SITE. BETWEEN JUNE 1991 AND NOVEMBER 2, 1993, EPA CONDUCTED A REMOVAL ACTION WHICH CONSISTED OF THE REMOVAL OF SEVERAL PCB-RELATED ELECTRICAL EQUIPMENTS (APPROXIMATELY 60 CAPACITORS AND TRANSFORMER DEBRIS); AND APPROXIMATELY 6,000 CUBIC FEET OF CONTAMINATED SOIL. BASED ON THE SAMPLING RESULTS, EPA FOUND NO GROUNDWATER CONTAMINATION. THE TOTAL COST TO DATE IS $2,168,358.29. THE IDENTIFIED PRPS AT THE SITE ARE BLUE RIDGE MEMBERSHIP CORPORATION (BREMCO) AND DUKE POWER CORPORATION (DUKE).

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown