# FLORIDA POWER AND LIGHT COMPANY
> **Administrative - Formal** · FY1998 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `22478`
- **Case Number:** 04-1998-0108
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- FLORIDA POWER AND LIGHT COMPANY (complaint) (settlement)
## Summary

A DETERMINATION WAS MADE THAT THE PRESENCE OF HAZARDOUS      WASTES AT FPL'S FORT MYERS PLANT FACILITY MAY PRESENT A      SUBSTANTIAL HAZARD TO HUMAN HEALTH OR THE ENVIRONMENT.  FPL  IS ORDERED TO CONDUCT MONITORING, TESTING, ANALYSIS AND      REPORTING TO ASCERTAIN THE NATURE AN DEXTENT OF SUCH HAZARD.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*