# DEDEAUX, ADRIAN
> **Administrative - Formal** · FY1998 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `22812`
- **Case Number:** 04-1998-0473
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- DEDEAUX, ADRIAN (settlement)
## Summary

RESPONDENT, AND OTHERS AT THE DIRECTION OF RESPONDENT,       DISCHARGED APPROX. 400-500 CUBIC YARDS OF EARTHEN MATERIAL   TAKEN FROM TEH EAST AND WEST BANK OF THE SOUTHERN END OF THE CHANNEL LEADING TO THE PEARL RIVER.  THE MATERIAL WAS PLACED BELOW THE ORDINARY HIGH WATER MARK OF THE PEARL RIVER        FORMING A LOW-WATER CROSSING APPROX. 100 FEET LONG, 30 FEET  WIDE AND 3-4 FEET DEEP.  TH ROAD CROSSING  DID NOT HAVE A    CULVERT TO ALLOW NORMAL PASSAGE OF AQUATIC ORGANISMS DURING  APPROPRIATE RIVER STAGES AND IMPEDED NORMAL HYDROLOGY.  THE  VIOLATION WAS CONFIRMED BY THE U.S. ARMY COE DURING A FIELD  INVESTIGATION ON 9/8/96 AND A SUBSEQUENT INSPECTION ON       11/19/96, WHERE RISING WATER LEVELS HAD ERODED SECTIONS OF   THE CROSSING.                                                ORDER REQUIRES:                                              RESPONDENT SHALL IMMEDIATELY CEASE PARTICIPATING IN,         CAUSING, OR ALLOWING ANY ADDITIONAL DISCHARGES OF ANY         DREDGED  OR  FILL MATERIAL.                                 RESPONDENT SHALL SUBMIT A CHANNEL BANK RESTORATION PLAN TO   EPA AT THE REFERENDED ADDRESS WITHIN 10 DAYS OF RECEIPT OF   THIS ORDER.  THE RESTORATION PLAN SHALL INCLUDE A PROCEDURE  TO STABILIZE AND RESTORE THE CHANNEL BANKS AT THE SOUTH END  OF THE CROSSING WHERE MATERIAL WAS TAKEN TO CONSTRUCT THE    LOW-WATER CROSSING.                                          WITHIN 48 HOURS OF RECEIPT OF THIS ORDER, RESPONDENT SHALL   INFORM EPA WHETHER RESPONDENT HAS CO

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*