FROM 1/93 THROUGH PRESENT THE PWCJAX EXCEEDED THE EFFLUENT LIMITATIONS SET FORTH IN THEIR NPDES PERMIT AND FAILED TO PROPERLY OPERATE AND MAINTAIN THE FAICLITY AS DOCUMENTED IN FLORIDA DEPT OF ENVIRONMENT PROTECTION INSEPCTION, US EPA INSPECTIONS, AND PWCJAX DIAGNOSTIC REPORT OF DECEMBER 1997.