DURING TWO 6-MONTH MONITORING PERIODS; FAILED TO SAMPLE MONTH MONITORING PERIODS; FAILED TO SAMPLE FOR LEAD AND COPPER FOR TWO CONSECUTIVE 6-MONTH M ONITORING MONITORING SITES BEGINNING JULY 1, 1993; PERIODS AT 5 MONITORING SITES BEGINNING JULY 1,1993 COMPLY WITH THE LEAD AND COPPER MONITORING FAILED TO PROPERLY NOTIFY PERSONS SERVED BY THE SYSTEM OF TO REPORT TO THE STATE WITHIN 48 HOURS ITS A FAILURE TO COMPLY WITH THE LEAD AND COPPER MONITORING SET FORTH IN 40 CFR 141.81(E), 141.86(C) REQUIREMENTS IN 40 CFR 141.81(E), 141.86(C) AND 141.86(D) (II); FAILED TO REPORT TO THE STATE WITHIN 48 HOURS ITS FAILURE TO COMPLY WITH THE LEAD AND COPPER MONITORING REQUIREMENTS SET FORTH IN 40 CFR 141.81(E), 141.8 6(C)