Case Summary for 04-2000-0882 (SDWA-04-2000-330): ROBARDS #8. RESPONDENTS FAILED TO NOTIFY EPA OF ANY PLANS TO ALTER THE SUBJECT WELL; NEVER SUBMITTED A FLUID ANALYSIS REPORT TO EPA UNTIL AFTER AN NOV WAS SENT TO L.A.W.; HAVE NEVER SUBMITTED AN ANNULUS PRESSURE MONITORING REPORT TO EPA.
Case Summary for 04-2000-0886 - (SDWA-04-2000-335) RESPONDENTS HAVE NOT DEMONSTRATED THE MECHANICAL INTEGRITY OF THE SUBJECT WELL SINCE MARCH 2, 1989; RESPONDENTS HAVE NOT SUBMITTED AN INJECTED FLUID ANALYSIS REPORT TO EPA SINCE THE PERMIT BECAME EFFECTIVE; RESPONDENTS HAVE NEVER SUBMITTED AN ANNULUS PRESSURE MONITORING REPORT TO EPA; RESPONDENTS LEFT A WELL TEMPORARILY ABANDONED FOR A PERIOD OF MORE THAN TWO YEARS WITHOUT PLUGGING IN ACCORDANCE WITH THE SUBJECT PERMIT OR OTHERWISE DEMONSTRATING THAT THE WELL WOULD NOT ENDANGER USDW'S.
Case Summary for 04-2000-0885 (SDWA-04-2000-334): MAGGIE ROBARDS #2. RESPONDENTS HAVE NOT SUBMITTED AN INJECTED FLUID ANALYSIS REPORT TO EPA SINCE THE PERMIT BECAME EFFECTIVE. RESPONDENTS HAVE NOT SUBMITTED AN ANNULUS PRESSURE MONITORING REPORT TO EPA SINCE JUNE 1993.