# BAYSHORE ESTATES, INC.
> **Administrative - Formal** · FY2001 · — · Final Order No Penalty
## Case
- **Activity ID:** `24673`
- **Case Number:** 04-2001-9038
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BAYSHORE ESTATES, INC. (settlement)
## Summary

CONSENT AGREEMENT AND ORDER ON CONSENT FOR COMPLIANCE -      8/16/2001.  RESPONDENT FAILED OBTAIN AN E & S PLAN APPROVAL  PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITIES AT THE SITE. RESPONDENT VIOLATED THE TERMS AND CONDITIONS OF THE NPDES    PERMIT DUE TO EXCESSIVE SLOPES ON DITCH BANKS AND SPOIL      PILES AND A FAILURE TO STABILIZE SEDIMENT AND RETAIN IT ON   THE SITE.  RESPONDENT FAILED TO OBTAIN AN NPDES PERMIT FOR   A DISCHARGE OF STORM WATER.  RESPONDENT FAILED TO INSTALL    AND/OR MAINTAIN TEMPORARY OR PERMANENT ADEQUATE MEASURES     TO CONTROL AND RETAIN SEDIMENT; DITCH, SWALE AND STOCKPILE   SLOPES WERE EXCESSIVELY STEEP CAUSING SLOPES TO BE EROSIVE   AND IN MANY AREAS COLLAPSE INTO DITCH CHANNESL; AND FAILURE  TO INSTALL ADEQUATE GROUND COVER TO RETAIN SEDIMENT THROUGH- OUT THE ENTIRE SITE.  IN VIOLATION OF CWA SECTION 404.       REDS NO:  2000042125091830

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*