← EPA enforcement cases

US STEEL-LEAD REFINERY

Judicial · FY1984 · — · Final Order With Penalty · 25308

$55K
Penalty
$0
Cost recovery
Compliance action

Case

Case Number
05-1984-0066
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
DOJ Docket
90-5-1-1-2314
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

BRIEF SYNOPSIS OF THE CASE UNITED STATES SMELTING LEAD REFINERY, INC. (U.S.S. LEAD) IS A SECONDARY LEAD REFINERY/SMELTER LOCATED IN EAST CHICAGO, INDIANA. THE FACILITY DISCHARGES A COMBINATION OF NON-CONTACT PROCESS COOLING WATER BOILER BLOWDOWN AND STORM WATER INTO THE GRAND CALUMET RIVER, TRIBUTARY TO LAKE MICHIGAN. THE FACILITY'S PERMIT IN0032425, ISSUED JUNE 15, 1975, EXPIRED MARCH 31, 1980. THE FACILITY HAS CONTINUED TO DISCHARGE POLLUTANTS SINCE ITS PERMIT EXPIRATION IN VIOLA- TION OF SECTION 301(A) OF THE CWA. THE FACILITY DID NOT SEEK PERMIT RENEWAL UNTIL SEPTEMBER 27, 1982. IN RESPONSE TO A REPORTED DUCK KILL, TWO PLANT INSPEC- TIONS WERE CONDUCTED AT THE FACILITY. ANALYTICAL RESULTS OF THE SAMPLES TAKEN DURING BOTH INSPECTIONS SHOW THAT THE FACILITY EXCEEDED ITS PERMIT LEVELS FOR LEAD. ADDITIONALLY, DISCHARGE MONITORING REPORTS INDICATE THAT THE PERMIT LEVELS FOR LEAD HAVE BEEN EXCEEDED FROM SEPTEMBER, 1982, THROUGH JUNE, 1984, INCLUSIVE. DUE TO THE POTENTIAL ENVIRONMENTAL THREAT PRESENTED BY THE UNPERMITTED DISCHARGES, IT WOULD BE DESIRABLE TO OBTAIN A JUDICIALLY ENFORCEABLE CONSENT DECREE OR ORDER TO COMPEL U.S.S. LEAD TO TAKE THE NECESSARY MEASURES TO COME INTO COMPLIANCE WITH THE STATUTORY PERMIT REQUIREMENTS. IT IS ALSO NECESSARY TO OBTAIN CIVIL PENALTIES, IN LIGHT OF THE LENGTHY HISTORY OF NONCOMPLIANCE, AN

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown