THE FOLLOWING VIOLATIONS WERE OBSERVEC DURING THE OEPA MARCH 15, 1983, INSPECTION: (A) FAILURE TO PROVIDE THE REQUIRED INFORMATION ON THE MANIFEST PURSUANT TO 40 CFR 262.21 (B) FAILURE TO PLACARD THE TRANSPORTER PURSUANT TO 40 CFR 262.33 (C) FAILURE TO DEVELP AND FOLLOW A WRITTEN WASTE ANALYSIS PLAN PURSUANT TO 40 CFR 265.13. (D) FAILURE TO POST DANGER - UNAUTHORIZED PERSONNEL KEEP OUT SIGNS AT EACH ENTRANCE TO THE ACTIVE PORTION OF THE FACILITY PURSUANT TO 40 CFR 265.14(C). (E) FAILURE TO DEVELOP AND FOLLOW A WRITTEN INSPECTION SCHEDULE PURSUANT TO 40 CFR 265.15. (F) FAILURE TO PROVIDE A DESCRIPTION OF THE FACILITY PER- SONNEL TRAINING PROGRAM PURSUANT TO 40 CFR 265.16. (G) FAILURE TO PROVIDE DOCUMENTATION OF THE TESTING AND MAINTENANCE OF TEH SAFETY, FIRE AND COMMUNICATION SYSTEM PURSUANT TO 40 CFR 265.33 (H) FAILURE TO DEVELOP AND IMPLEMENT A CONTINGENCY PLAN PURSUANT TO 40 CFR 265.51. (I) FAILURE TO MAINTAIN A COPY OF THE CONTINGENCY PLAN AT THE FACILITY PURSUANT TO 40 CFR 265.53. (J) FAILURE TO DESIGNATE AN EMERGENCY COORDINATOR PURSUANT TO 40 CFR 265.55. (K) FAILURE TO DEVELOP AN OPERATING