Respondent started construction on 1/5/2009, disturbing over 67 acres of land and failed to comply with the CGP. An NOI was submitted on 3/19/2004; permit coverage was obtained. Based on a 2/23/2010 letter, the site was stabilized pending and future work. Penalty has been calculated for SWPPP and BMP deficiencies.