# Eagle Energy Acquisitions, LP
> **Administrative - Formal** · FY2012 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `2600079394`
- **Case Number:** 06-2012-1750
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Eagle Energy Acquisitions, LP (complaint) (settlement)
## Summary

Violation:  The Respondent's oil field facility was a point source which discharged a pollutant to a waters of the US.  The facility was inspected by the EPA on November 2, 2011.  During the inspection the EPA observed where the facility had discharged oil field brine and drilling mud to a tributary of Plum Creek.

Relief: An Administrative Order was issued to the Respondent on December 13, 2011 requiring the following:  cease all discharges of pollutants from the facility; remove all brine and drilling mud from the tributary of Plum Creek; within 30 days of the Order, Respondent shall provide information on background salinity levels in the tributary of Plum Creek, and on the background salinity of the groundwater at the point of discharge to the creek; and within 30 days, Respondent shall provide written certification to EPA Region 6 that these requirements have been completed.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*