The facility was inspected by EPA Contractors on August 12, 2011 and the Inspection Checklist was reviewed by EPA enforcement staff. The contractor noted there was a failure to comply with temporary closure and a failure to monitor the tanks. EPA staff reviewed the Checklist and concurred. EPA issued a Field Citation from the desk.