The December 22, 2012 2011 second Amended AO requires system to comply with the Combined Radium MCL of 5 pCi/L as soon as possible and no later than July 31, 2012; submit to U.S. EPA and Illinois EPA a letter stating RespondentÂs intention to comply within 10 days from receipt of this Order; submit to U.S. EPA and Illinois EPA a detailed plan (Plan) for bringing the System into compliance with the Combined Radium MCL, including milestones with dates for planning engineering/design, obtaining funding, Illinois EPA construction permit, commence construction/equipment installation, complete construction/equipment installation, and Illinois EPA operating permit. The AO also requires system to submit to U.S. EPA and Illinois EPA in writing, a progress report on the status of achieving each identified milestone by January, 31, 2012, March 31, 2012 and by the end of each subsequent calendar quarter, and to continue to sample quarterly for combined radium and provide public notice each quarter as long as the violations persists.
Wildlife met the requirements of the December 2011 Order by notifying U.S. EPA and Illinois EPA of its intention to comply with the terms of the December 2011 Order by submitting a construction permit application to Illinois EPA on December 30, 2011, and sending U.S. EPA a copy with specifications, construction drawings, and engineer's design summary on the same day. The permit application contained a detailed plan for bringing Wildlife into compliance w