1/6/12 - COMPLIANCE ORDER ISSUED.
BASF VIOLATED CWA 301 AND 402(p)BY FAILING TO COMPLY WITH THE PERMIT AND FOR DISCHARGES NOT AUTHORIZED BY PERMIT.
ORDER REQUIRES:
A. WITHIN 90 DAYS, DEVELOP AND IMPLEMENT CONTROL MEASURES TO CEASE THE DISCHARGE OF WASTEWATER FROM STORMWATER OUTFALLS #1 AND 2 AND FROM GENERAL REFUSE LANDFILL AND NITRATE LANDFILL.
B. WITHIN 90 DAYS, MODIFY THE SWP3 TO INCLUDE:
- ALL POTENTIAL POLLUTANT SOURCES INCLUDING BUT NOT LIMITED TO POLLUTANTS FROM NITRATE LANDFILL, GENERAL REFUSE LANDFILL, CLOSE NITRATE LANDFILL, RR TIE STORAGE AREA, RR CAR WASHING AREA AND DRUM CRUSHING OPERATION;
-DETAILED SITE MAP INDICATING THE OUTLINE OF EACH DRAINAGE AREA TO ITS CORRESPONDING STORMWATER OUTFALL, INCLUDING BUT NOT LIMITED TO DRAINAGE AREAS OF THE NITRATE LANDFILL, GENERAL REFUSE LANDFILL, CLOSED NITRATE LANDFILL, RR TIE STORAGE CAR WASHING AREA AND DRUM CRUSHING OPERATION; SUCH DELINEATION SHOULD INCLUDE THE BOUNDARIES OF THE 175-ACRE INDUSTRIAL, PRODUCTION, AND PROCESS AREAS AND THE BOUNDARIES OF THE 570-ACRE AREA COVERED BY PERMIT;
-INVENTORY OF ALL MATERIALS POTENTIALLY EXPOSED TO PRECIPITATION INCLUDING BUT NOT LIMITED TO WASTE AND MATERIALS AT THE NITRATE LANDFILL, GENERAL REFUSE LANDFILL, CLOSE NITRATE LANDFILL, RR TIE STORAGE AREA, RR CAR WASHING AREA AND DRUM CRUSHING OPERATION;
-ID AND ASSESSMENT OF NITRATE LANDFILL, GENERAL REFUSE LANDFILL, CLOSED NITRATE LANDFILL, RR TIE STORAGE AREA, RR CAR WASHING AREA AND DRUM CRUSHING OPERATION, AN