FACILITY VIOLATED THE GENERAL DUTY CALUSE (GDC) SECTION 112(r) OF THE CAA, 42 U.S.C. SECTION 7412(r)(1). EPA INSPECTION REVEALED A SAFETY CONCERN UNDER THE GENERAL DUTY CLAUSE REGARDING THE DESIGN OF THE FAICLITY'S FIRE PROTECTIOHN SYSTEM TO PROTECT EIGHTEEN (18) 30,000 LB PROPANED TANKS. THE FACILITY WILL RECEIVE AN ADMINISTRATIVE ORDER (AO) TO COMPLY WITH APPLICABLE INDUSTRY CODES AND STANDARDS.