A PROPOSED ADMINISTRATIVE ORDER REQUIREING PERRYSVILLE TO COMPLY WITH RHE SDWA MAXIMUM CONTAMINATE LEVEL FOR NI- TRATE WAS ISSUED ON 8/19/87. THE TOWN'S BOARD TOOK ISSUE WITH THE COMPLIANCE SCHEDULE SET OUT IN THE PAO. THE SCHED- ULE WAS REVISED TO REFLECT THE TOWN'S DECISION TO DRILL A TEST WELL WITHOUT AN ENGINEERING FEASIBILITY STUDY AND A FI- NAL ADMINISTRATIVE ORDER WAS ISSUED 9/30/87.