THIS CASE INVOLVES THE DEMOLITION OF AN ORE BOAT AT 5 1/2 SLIP, E. 6TH ST. ASHTABULA, OHIO. THE MERLE MCCURDY CON- TAINES FRIABLE ASBESTOS MATERIALS, AND THE PROPERTY SURROUND ING THE BOAT CONTAINS FRIABLE ASBESTOS MATERIALS, WHICH MAY HAVE RESULTED FROM THIS DEMOLITION AS WELL AS PREVIOUS ORE BOAT DEMOLITIONS. DURING MARCH OR APRIL 1988, TRIAD SALVAGE, INC., COMMENCED DEMOLITION OF THE ORE BOAT. TRIAD FAILED TO PROVIDE NOTICE OF ASBESTOS REMOVAL TO USEPA OR THE OHIO EPA, FAILED TO RE- MOVED FRIABLE ASBESTOS MATERIAL PRIOR TO BEGINNING DEMOLI- TION OF BOAT STRUCTURES, FAILED TO FOLLOW ASBESTOS REMOVAL PROCEDURES (I.E., CONTAINMENT AND WETTING), AND FAILED TO PROPERTY DISPOSE OF THE FRIABLE ASBESTOS MATERIAL REMOVED, ALL VIOLATION $@ USC SECT 7401 ET SEQ. AND THE NAT'L EMIS- SIONS STANDARDS FOR HAZARDOUS AIR POLLUTUANTS (NPDES), 40 CFR PART 61, PROMULGAED THEREUNDER, SPECIFICALLY SUBPART M, NAT'L EMISSIONS STANDARD FOR ASBESTOS.