MEITHER MARIA WHITE NOR MYSELF ARE AWARE OF ANY PCB VIOLA- TIONS FOR WHICH TO FILE A COMPLAINT. GE MAY BE IN VIOLATION FOR OPERATING A FREON FLUSH SYSTEM WITHOUT A PERMIT. HOWEVER, NO MENTION IS MADE OF THIS IN THE INSPECTION REPORT AND WE HAVE NO ACTUAL EVIDENCE OF THIS. ADDITIONALLY, G.E. CEASED OPERATION OF THE FREON FLUSH SYSTEM AFTER THE DECEM- BER INSPECTION. MARIA WHITE IS CURRENTLY COLLECTING EVI- DENCE AS TO WHETHER OR NOT G.E. OPERATED WITHOUT A PERMIT.