# BIRCH MACHINERY
> **Administrative - Formal** · FY1989 · — · Final Order With Penalty
## Case
- **Activity ID:** `27202`
- **Case Number:** 05-1989-0147
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $14K
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BIRCH MACHINERY (complaint) (settlement)
## Summary

COMPLAINT ALLEGED FAILURE TO LABEL 2 DRUMS OF PCB-CONTAMI- NATED FLUID; A STORAGE PIT CONTAINING STORED PCB-CONTAMINA-  TED OIL AND SLUDGE AND A PCB STORAGE AREA; FAILURE TO PROPER LY STORE PCB CONTAINERS AND DEVELOP SPILL PREVENTION CONTROL AND COUNTER MEASURE PLAN; AND FAILURE TO USE PCBS IN A TOTAL LY ENCLOSED MANNER.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*