REPRESENTATIVES OF U.S.EPA CONDUCTED AN INSPECTION OF HOLY CROSS LUTHERAN SCHOOL, MADISON, WI FOR PURPOSES OF DETERMING COMPLIANCE WITH AHERA. THE INSPECTION REVEALED THAT HOLY CROSS LUTHERAN SCHOOL HIRED F.W. ZASTROW HEATING & COOLING (F.W. ZASTROW) TO PREPARE AN INSPECTION REPORT AND MANAGE- MENT PLAN AND CONDUCT A RESPONSE ACTION TO ABATE ANY ASBESTOS REQUIRING REMOVAL. UPON REVIEW OF THE LEA RECORDS AND A WALK THROUGH INSPECTION OF THE SCHOOL, IT WAS DETER- MINED THAT F.W. ZASTROW HAD FAILED TO IDENTIFY ALL HOMO- GENOUS AREAS OF FRIABLE SUSPECTED ASBM IN TWO SEPARATE AREAS WITHIN THE SCHOOL. F.W. ZASTROW'S FAILURE TO IDENTIFY SUS- PECTED ACBM WAS A VIOLATION OF THE ACT.