# PITSCH ENGINEERING ET. AL.
> **Administrative - Formal** · FY1993 · — · Final Order No Penalty
## Case
- **Activity ID:** `28214`
- **Case Number:** 05-1993-0228
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** $0
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- DUNBAR EXCAVATION(DEMOLITION CONTRACTOR)
- FORD PETOSKEY BUILDING
## Summary

THESE ARE TWO CASES, WITH PITSCH ENGINEERING THE ASBESTOS    ABATEMENT CONTRACTOR IN EACH CASE.   IN THE FIRST CASE, A    FINDING OF VIOLATION (FOV) WAS ISSUED ON 10/15/92 TO PITSCH, AS WELL AS PINE REST CARESTION HOSPITAL (OWNER) AND          RIVERSIDE  SAND AND GRAVEL (DEMOLITION CONTRACTOR) FOR       VIOLATION OF WORK PRACTICE STANDARDS AT 40 CFR 61.147 (E)    AND (E). IN THE SECOND, AN FOV WAS ISSUED TO PITSCH, AS WELL AS TO FORD PETOSKEY BUILDING (OWNER) AND DUNBAR EXCAVATION   (DEMOLITION CONTRACTOR).                                     11/12/92 SECTION 113 CONFERENCE W/PITSCH + DUNBAR.           11/18/92 SECTION 113 CONFERENCE W/PINE REST HOSPITAL +       RIVERSIDE SAND.                                              11/25/92 COMPANIES SUBMIT INFORMATION.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*