# EASTERN ENVIRONMENTAL CONSTRUCTION CORPORTATION
> **Administrative - Formal** · FY1993 · — · Withdrawn by Region/State
## Case
- **Activity ID:** `28290`
- **Case Number:** 05-1993-0539
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn by Region/State
- **Penalty assessed:** $0
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
## Summary

THIS CASE INVOLVES VIOLATIONS OF THE ASBESTOS NESHAP.  THE   SPECIFIC VIOLATIONS INVOLVED ARE:  40 C.F.R.                 61.145(B)(3)(IV)(A)(1) - FAILURE TO PHONE IN NEW START DATE;  40 C.F.R. 61.145(B)(3)(IV)(A)(2) - FAILURE TO PROVIDE       TIMELY WRITTEN NOTICE OF NEW START DATE;  40 C.F.R.          61.145(B)(4)(V) - FAILURE TO INCLUDE ANALYTICAL METHODS USED TO DETECT RACM IN NOTICE;  AND 40 C.F.R. 61.145(C)(6)(I) -   FAILURE TO KEEP STRIPPED RACM ADEQUATELY WET UNTIL COLLECTED OR CONTAINED FOR DISPOSAL. EASTERN ENVIRONMENTAL WAS THE     ABATEMENT CONTRACTOR.  THE OWNER OF THE FACILITY, THE CITY   OF AKRON, IS ALSO A PARTY TO THE SUIT.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*