BURLINGTON NORTHERN RAILROAD TIE TREATMENT FACILITY
Administrative - Formal · FY1993 · — · Final Order No Penalty · 28404
$0
Penalty
$0
Cost recovery
—
Compliance action
Case
Case Number
05-1993-0885
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
N
Self-disclosure
N
Summary
THE FACILITY IS A WOOD PRESERVING OPERATION WHICH BN BEGAN OPERATION IN 1907, AND IT LIES WITHIN THE MUNICIPAL BOUNDARIES OF BAXTER AND BRAINERD, MINNESOTA. THE AREA IS RURAL AND IS LOCATED ABOUT 800-1000 FEET FROM HIGHWAY 371 AND 3000 FEET FROM THE MISSISSIPPI RIVER. RESIDENTIAL AREAS ARE LOCATED TO WITHIN ABOUT 1,000 FEET OF THE NORTHEAST AND SOUTHEAST OF THE SITE. PRIMARY CONTAMINANTS OF CONCERN INCLUDE: POLYNUCLEAR AROMATIC HYDROCARBONS (PAH), PHENOLS, AND HETEROCYCLES. THE COMPANY USED CREOSOTE TO TREAT THE TIES, AND IN THE 1950S ADDED NUMBER 5 FUEL OIL TO THE TREATMENT MIXTURE ON A 1:1 RATIO; LATER THE MIXTURE WAS CHANGED TO CREOSOTE AND COAL TAR WHICH IS CURRENTLY USED ON A 70:30 MIXTURE. THE TREATMENT PROCESS USED AN UNLINED SURFACE IMPOUNDMENT FOR THE DISPOSAL OF WASTEWATER FROM THE PROCESS. THE FIRST IMPOUNDMENT WAS ABOUT 60,000 SQUARE FEET IN AREA, BUT IT EVENTUALLY FILLED WITH SLUDGE AND WAS BURIED IN THE 1930S. A SECOND IMPOUNDMENT WAS USED UNTIL 1982 WHEN A WASTEWATER TREATMENT PLANT WAS BUILT. GROUNDWATERS AND SOILS AT THE SITE HAVE BEEN CONTAMINATED BY THIS PROCESS. A PLUME ABOUT 1000 FEET LONG AND ABOUT THE WIDTH OF THE EXISTING LAGOON WAS DETECTED DURING RI WORK. TWO POTABLE WELLS (HAROLD'S CLUB AND A REDI MIX PLANT) ARE POTENTIALLY DOWNGRADIENT OF THE PLUME AND LIE BETWEEN THE PLUME AND THE RIVER. A CONSENT ORDER WAS ENTERED BETWEEN