← EPA enforcement cases

STICKNEY/TYLER LANDFILL

Administrative - Formal · FY1994 · — · Final Order No Penalty · 29016

$0
Penalty
$0
Cost recovery
$26.00M
Compliance action

Case

Case Number
05-1994-0421
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
N
Self-disclosure
N

Defendants (26)

Summary

THIS IS A SACM PILOT SITE ALONG THE OTTAWA RIVER IN TOLEDO CONSISTING OF TWO MUNICIPAL CO-DISPOSAL LANDFILLS. NUMEROUS UNCONTROLLED HAZARDOUS WASTE SITES EXIST ALONG THE OTTAWA, INCLUDING THE DURA SITE WHICH DISCHARGES HIGH LEVELS OF PCBS INTO THE RIVER. THE AOC SIGNED 5/2/94 COMMITS THE PRPS TO PERFORM AN EE/CA AT THE SITE, LARGELY TO EVALUATE A PRESUMPTIVE REMEDY - ANTICIPATED TO BE A SOLID WASTE CAP FOR THE LANDFILL AND POSSIBLY LEACHATE TREATMENT /COLLECTION SYSTEMS. ON JANUARY 16, 1998 EPA PUBLISHED NOTICE OF A PROPOSED ADMINISTRATIVE ORDER ON CONSENT WITH A GROUP OF PRPS KNOWN AS THE STICKNEY-TYLER ADMINISTRATIVE GROUP ( STAG ) UNDER WHICH THE RESPONDENTS WILL CONDUCT RESPONSE ACTIONS AT THE STICKNEY AND TYLER LANDFILLS INCLUDE INSTALLATION OF A MULT- LAYER LANDFILL COVER SYSTEM OVER THE SITES. THIS AOC WAS SIGNED AND TYLER LANDFILLS INCLUDE INSTALLATION OF A MULT- LAYER LANDFILL COVER SYSTEM OVER THE SITES. THIS AOC WAS SIGNED BY THE DIRECTOR OF SUPERFUND DIVISION ON 2/27/98. THE EAM CALL FOR THE INSTALLATION OF A MULTI-LAYER COVER SYSTEM IN COMPLIANCE WITH THE FUNCTIONAL REQUIREMENTS OF THE OHIO ADMINISTRATIVE CODE (OAC) 3745-27-11, LANDFILL GAS COLLECTION AND PASSIVE VENTING TO THE ATMOSPHERE, AND INSTITUTIONAL CONTROLS. EPA COVENANTS NOT TO SUE OR ISSUE ADMINISTRATIVE ORDERS TO THE SETTLING PARTIES, PURSUANT TO SECTIO

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown