# CIRCLE SMELTING CORPORATION
> **Administrative - Formal** · FY1995 · — · Final Order No Penalty
## Case
- **Activity ID:** `29087`
- **Case Number:** 05-1995-0053
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** $0
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CIRCLE SMELTING CORPORATION
## Summary

A UAO WAS ISSUED TO ABATE THE THREATENED RELEASE OF LEAD     INTO THE ENVIROMENT IN THE VILLAGE OF BECKEMEYER, IL.  THE   CONDITIONS AT THE SITE POSED A THREAT TO THE PUBLIC HEALTH,  WELFARE OR THE ENVIRONMENT.  THE UAO REQUIRED THE            RESPONDENTS TO BASICALLY PROVIDE A CLEAR PATH FOR THE WATER  MAIN REPLACEMENT PROJECT.  THE WATER MAIN REPLACEMENT WAS TO OCCUR THROUGH LEAD CONTAMINATED SOILS AND SALTS CONTAINING   LEAD SLAG AND DUST FROM THE SMELTER PROPERTY.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*