# CANNELTON INDUSTRIES SITE
> **Administrative - Formal** · FY1995 · — · Final Order No Penalty
## Case
- **Activity ID:** `29090`
- **Case Number:** 05-1995-0056
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CANNELTON INDUSTRIES (complaint) (settlement)
## Summary

RESPONDENT TO THIS AOC IS ALREADY COMPLYING WITH AN AOC FOR  REMEDIAL                                                     DESIGN FOR THE ENTIRE SITE.  AS PART OF THE RD PROCESS,      RESPONDENT                                                   PROPOSED EXTENDING A PRIOR SHORELINE STABILIZATION PROCEDURE (SINCE THE                                                   RD WILL TAKE SOME TIME TO CACULATE).  EPA CONCERNED AND      PROPOSED USE OF                                              THIS AOC TO CONDUCT THE SHORELINE STABILIZATION AS A REMOVAL ACTION.                                                      THE CANNELTON INDUSTRIES SITE IS A FORMER LEATHER TANNERY    LOCATED IN                                                   SAULT STE. MARIE, MI.  IN 1992, EPA ISSUED A ROD REQUIRING   CONSTRUCTION                                                 OF AN ON-SITE LANDFILL AND EXCAVATION OF CHROMIUM            CONTAMINATED                                                 SEDIMENTS.  ON 4/12/93, EPA ENTERED INTO AN ADMINISTRATIVE   ORDER ON                                                     CONSENT, PURSUANT TO CERCLA 106, FOR REMEDIAL DESIGN WITH    CANNELTON                                                    INDUSTRIES.  CANNELTON INDUSTRIES AGREED TO PERFORM THE      REMEDIAL DESIGN                                              FOR EPA'S SELECTED REMEDY AT THE SITE.                       SECOND MODIFICATION OF AOC FOR REMEDIAL DESIGN ISSUED        4/15/97.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*