# ACME STEEL COMPANY, INC.
> **Judicial** · FY1995 · — · Final Order With Penalty
## Case
- **Activity ID:** `29530`
- **Case Number:** 05-1995-0581
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $410K
- **Cost recovery:** —
- **Compliance action $:** $2.60M
- **Multimedia (multi-env):** N
## Defendants
- ACME STEEL COMPANY, INC. (complaint) (settlement)
## Summary

(1) ACME'S COKE BATTERIES HAVE VIOLATED THE ILLINOIS STATE   IMPLEMENTATION PLAN (ILLINOIS SIP) OPACITY LIMITATIONS FOR   FUGITIVE AND CONTROLLED EMISSIONS DURING PUSHING OPERATIONS; (2) ACME'S BOF SHOP HAS VIOLATED THE ILLINOIS SIP OPACITY    LIMITATION FOR FUGITIVE AND CONTROLLED EMISSIONS; AND ACME'S BOF SHOP HAS VIOLATED THE ILLINOIS SIP REQUIREMENT THAT ALL  EMISSIONS GENERATED DURING DESULFURIZATION OPERATIONS BE     CAPTURED AND CONTROLLED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*