# RAMONA PARK LANDFILL
> **Administrative - Formal** · FY1996 · — · Final Order No Penalty
## Case
- **Activity ID:** `29756`
- **Case Number:** 05-1996-0308
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $75K
- **Multimedia (multi-env):** N
## Defendants
- RAMONA PARK LANDFILL (settlement)
## Summary

REMOVAL - CURRENTLY DOING PRP SEARCH.                        ON MAY 14, 1998, REGION 5 SUPERFUND DIVISION DIRECTOR ISSUED AN ADMINISTRATIVE ORDER BY CONSENT (AOC) FOR THE RAMONA PARK BATTERY CASING AREA SUPERFUND SITE, LOCATED AT 6255 AUBURN   ROAD, UTICA, MACOMB COUNTY, MICHIGAN.  THE AOC WAS SIGNED BY THE FOLLOWING 11 POTENTIALLY RESPONSIBLE PARTIES (PRPS):     AUBURN SUPPLY COMPANY, CHRYSLER CORPORATION, DETROIT EDISON  COMPANY, FORD MOTOR COMPANY, GENERAL MOTORS CORPORATION,     GLICK IRON & METAL COMPANY, H. HIRSCHFIELD SONS COMPANY, L.  SURATH &* SONS, INC., MICHIGAN BELL TELEPHONE COMPANY, SEARS ROEBUCK AND CO., AND SLC RECYCLING INDUSTRIES, INC.  UNDER   THE AOC, THE PRPS ARE REQUIRED TO CONDUCT AN ENGINEERING     EVALUATION AND COST ANALYSIS (EE/CA) FOR THE SITE AND PAY    COSTS OF U.S. EPA OVERSEEING THE ACTIVITIES CONDUCTED UNDER  THE AOC.  BACKGROUND:  THE RAMONA PARK BATTERY CASING AREA   SITE IS APPROXIMATELY 4-6 ACRE AREA LOCATED IN A RESIDENTIAL RECREATIONAL AREA IN UTICA, MICHIGAN.  THE SITE IS SITUATED  IN THE FLOOD PLAIN OF THE CLINTON RIVER AND CONTAINS A SIGNI FICANT QUANTITY OF LEAD-ACID BATTERY CASINGS.  THE SURFACE   SOIL SAMPLING AT THE SITE IN 1992 INDICATED THE PRESENCE OF  LEAD IN THE RANGE OF 48 PPM TO 207,000 PPM.  THE SUBSURFACE  SAMPLES INDICATE LEAD UP TO 8,700 PPM AT A DEPTH OF 6.5 FEET PRP AUBURN SUPPLY COMPANY IS THE CURRENT OWNER OF THE SITE.  THROUGH 1966, STANDARD LEAD CORPORATION, NOW KNOWN AS SLC    RECYCLING INDUSTRIES, INC., ENGAGED 

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*