MORECO ENERGY INC., OPERATED A USED OIL STORAGE AND TRANSFER FACILITY AT THE SITE FROM MARCH 1988 THROUGH THE END OF DECEMBER 1988 OR EARLY JANUARY 1989, WHEN THE SITE WAS ABANDONED. EPA PERFORMED A REMOVAL ACTION AT THE SITE BEGINNING ON OR ABOUT JUNE 15, 1992, AND ENDING ON OR ABOUT OCTOBER 1, 1993. ALL PRPS LISTED WERE GENERATORS WHOSE USED OIL WAS SENT TO THE SITE, WITH THE EXCEPTION OF MR. LEVINE WHO HELD TITLE TO THE PROPERTY DURING THE PERIOD OF OPERATIONS.