← EPA enforcement cases

GSR JEDBURG, LLC / STRATHMORE PD

Administrative - Formal · FY2012 · — · Final Order With Penalty · 3000034760

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2012-4503
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (2)

Summary

6/26/2012 - CONSENT AGMT ISSUED, ASSESSING A PENALTY OF $19,000 DUE WITHIN 30 DAYS. ALLEGATIONS: ON MARCH 29, 2011, EPA AND SC DEPT OF HEALTH AND ENVIRONMENTAL CONTROL-OCEAN AND COASTAL RESOURCE MGMT (SCDHEC-OCRM) PERFORMED A COMPLIANCE STORMWATER EVALUATION INSPECTION (CSWEI) AT THE DEVELOPMENT. DURING THE CSWEI, EPA INSPECTORS OBSERVED THE FOLLOWING: A. SILT FENCING WAS IMPROPERLY INSTALLED AND MAINTAINED THROUGHOUT THE DEVELOPMENT. THE PERMIT REQUIRES BMPs BE PROPERLY SELECTED, IMPLEMENTED, AND MAINTAINED TO MINIMMIZE POLLUTANTS IN DISCHARGES. THE PERMIT REQUIRES THE MODIFICATION OF EXISTING BMPs OR ADD'L BMPs AS NECESSARY TO COMPLY WITH THE PERMIT OR WITH WATER QUALITY STANDARDS. SEDIMENT-LADEN STORMWATER UNDERCUT PORTIONS OF THE SILT FENCING, ALLOWING SEDIMENT TO DISCHARGE OFFSITE. THERE WERE ALSO HOLES IN SOME OF THE SILT FENCING ALLOWING ADD'L SEDIMENT TO DISCHARGE OFFSITE. B. THE SEDIMENT TRAPS AND SEDIMENTATION POND SLOPES NEED TO BE MAINTAINED AND STABILIZED. THE PERMIT REQUIRES BMPs BE PROPERLY SELECTED, IMPLEMENTED AND MAINTAINED TO MINIMIZE POLLUTANTS IN DISCHARGES. THE PERMIT REQUIRES THE MODIFICATION OF EXISTING BMPs OR ADD'L BMPs AS NECESSARY TO COMPLY WITH THE PERMIT OR WITH WATER QUALITY STANDARDS. C. A DITCH WAS CUT ALONG THE NEWLY-PAVED ROADWAY TO ALLOW STORMWATER TO FLOW DIRECTLY INTO THE SEDIMENT BASIN OUTFALL AND THEN OFFSITE. HOWEVER, STORMWATER FLOW IN THE DITCH BYPASSES BMPs DESIGNED TO TRAP SEDIMENT BEFORE FLOWING INTO A CULVERT AN

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown