A STOP WORK ORDER WAS ISSUED TO COMPEL THE OWNER AND OPERATOR OF A BUILDING TO COMPLY WITH THE ASBESTOS NESHAP. THE OWNER STOPPED WORK, AND SUBSEQUENTLY HIRED A CONTRACTOR TO REMOVE DISTURBED ASBESTOS-CONTAINING MATERIALS, AND TO ENCAPSULATE OTHER MATERIALS STILL ON BUILDING COMPONENTS.