# HOSKINS MANUFACTURING COMPANY
> **Administrative - Formal** · FY1997 · — · Final Order With Penalty
## Case
- **Activity ID:** `30658`
- **Case Number:** 05-1997-0797
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $55K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- HOSKINS MANUFACTURING COMPANY (complaint) (settlement)
## Summary

HOSKINS MANUFACTURING COMPANY'S UNDERGROUND INJECTION WELL   IS REGULATED BY THE UNDERGROUND INJECTION CONTROL PROGRAM AT 40 C.F.R. PART 144.  REGION 5 ALLEGED THAT HOSKINS HAD       MULTIPLE VIOLATIONS OF ITS UIC PERMIT, INCLUDING THE FAILURE TO MAINTAIN INJECTION PRESSUREAND TO PROPERLY REPORT THE     MINIMUM PRESSURE DIFFERENTIAL, THE FAILURE TO PROPERLY       REPORT INJECTION VOLUMES AND ADDITIONS TO THE ANNULUS SYSTEM AND THE FAILURE TO PROPERLY TEST THE WELL'S AUTOMATIC WARN-  ING AND SHUT-OFF SYSTEM.  IN ADDITION, ON TWO ACCESSIONS,    HOSKINS INJECTED HAZARDOUS WASTE INTO THE WELL WITHOUT       PROPER AUTHORIZATION.  THE PROPOSED FINDINS AND ADMINISTRA-  TIVE ORDER WITH PENALTY, FILED ON FEBRUARY 24, 1998, SOUGHT  A PENALTY OF $82,000.  HOSKINS AGREED TO COMPLY WITH ITS     PERMIT IN THE FUTURE AND INSTALLED A COMPUTERIZED MONITORING SYSTEM.  THE CIVIL PENALTY WILL BE PAID IN EIGHTEEN MONTHLY  INSTALLMENTS.PMT OF $56,718.60 NOV 1, 2001.  COMPLIED WITH   THE APPLICABLE REQUIRMENTS OF CACO.  CASE CLOSED 11/01/01.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*